darbakBRAND IDENTITY / DIGITAL PRODUCT

Every delivery.
A clear way forward.

A connected identity and dispatch experience for the people coordinating last-mile retail deliveries.

Dubai–Sharjah / United Arab Emirates
PROJECT
Darbak
INDUSTRY
Last-mile logistics
SCOPE
Identity · Product UX · Interface
EXPERIENCE
Dispatch · Handover · Delivery
Darbak campaign: a delivery rider at an urban loading forecourt at dusk
darbakTHE NEXT STOP STARTS HERE.Explore the platform
LAST-MILE OPERATIONS, CONNECTED.

The city moves.
Stay one
step ahead.

Give every route a plan.
Give every handoff a clear owner.

Inside Darbak
ROUTE HANDOFF
All the context.Right where you need it.
DUBAI–SHARJAH / DISPATCH & DELIVERY
01 — PLAN02 — DISPATCH03 — DELIVER↓ EXPLORE THE EXPERIENCE
THE CHALLENGE

Deliveries change.
The plan needs to keep up.

A missed recipient, a full route, or a rider reaching the end of a shift can change the next delivery. The dispatcher needs the reason, the available capacity, and a clear next action together.

Darbak brings those decisions into one workspace. The visual identity carries the same idea: a continuous route, with a direction that is always clear.

01 / DISPATCH WORKSPACE

The whole shift. In one view.

A detailed operational workspace with route progress, service zones, and exceptions. Explore the tabs, open a route, and reassign a stop.

PRODUCT DESIGN / DISPATCH CONSOLE SAMPLE ROUTE RECORDS
Workspace / Overview Shift snapshot
DISPATCH / DUBAI–SHARJAH

Your shift, in focus.

One view of routes, capacity, and deliveries that need attention.

17:42 GST AFTERNOON SHIFT
Completed stops30of 56 scheduled
Active routes05across service zones
Open exceptions04awaiting dispatch review
Shift ends22:00Gulf Standard Time

Completed stops

Today · through 17:00
30 completed · 17:00

Service network

6 zones
Bur DubaiDeiraAl QusaisAl NahdaAl KhanMuwailehARABIAN GULFSERVICE NETWORK / SCHEMATIC
4 stops need your attentionReview failed attempts before assigning a new delivery window.

Routes on the road 5

Route / riderService zoneProgressArrivalStatus
Al Nahda6 / 11 stops18:40Late
Deira9 / 12 stops17:55On time
Muwaileh4 / 14 stops19:10At risk
Al Qusais8 / 10 stops17:20On time
Al Khan3 / 9 stops18:05At risk
Workspace readyGST · Distances in km · Currency AED
02 / OPERATIONAL INTELLIGENCE

Detail that makes a decision easier.

Capacity, handoff checks, and delivery progress — three focused views that bring the next action into focus.

Dusk campaign imagery of a Gulf distribution district
01 / CAPACITY ROUTE RT-2148

Room for the next stop.

8/12PARCEL SLOTS
VEHICLE / MOTORCYCLECAPACITY AVAILABLE
02 / HANDOFF DISPATCH CHECKS

Check before you assign.

A clear sequence for the person making the decision.

Confirm the building, entrance, and recipient instructions.
STEP 1 OF 4OPERATOR IN CONTROL
03 / DELIVERY FLOW CURRENT SHIFT

From assigned to received.

56 scheduled stops
Scheduled56Completed30Open26
Completed Open stops
STATUS / ROUTE RECORDSONE CONNECTED VIEW
darbakDISPATCH CONTROL / ZONE CONFIGURATIONGST · 17:42
Zone demand Al Nahda
10open stops
10:00 14:00 18:00
Shift time
17:42GULF STANDARD TIME
Next handover · 18:00
New assignments ON
Accepting eligible stops
Exception alerts ON
Alerts visible to operator
Parcel limit PER ROUTE
12 parcels
2 slots available · 10 in use
Assignment mode
Suggestions shown. Operator confirms.
Active service zone
04

Al Nahda

Keep the delivery window, parcel capacity, and assignment mode together.

AVAILABLE FOR DISPATCH
03 / CONNECTED PRODUCT SYSTEM

Designed around the actual work.

From the first assignment to the final confirmation, each component answers a specific operational question.

Address confirmed
Parcel ready
Rider assigned
RT-2148 Al Nahda
Collected → On the road → Delivered
ROUTING & HANDOFFS

One route. Every moving part.

Connect the parcel, rider, destination, and delivery window in a single operational record.

Reassignment STOP 07
014
Current riderShift ending · Al Nahda
Review
↓
027
Available rider0.6 km away · 4 parcel slots
Location, capacity, and shift context stay visible.
EXCEPTION MANAGEMENT

A handoff with all the context.

See why a stop failed and who can take it next, without losing the delivery history.

Proof of delivery
Recipient confirmation
Delivery timestamp17:38 GST
DELIVERY CONFIRMATION

The last step, recorded.

A timestamp, recipient confirmation, and delivery evidence in one place.

Customer updates
DARBAK / DELIVERY UPDATE

Your delivery is on its way. We’ll let you know when your rider arrives.

Order DK-8042 · SMS
Ready for operator review
COMMUNICATION

Keep the recipient informed.

Clear updates when the route changes or the rider is on the way.

BARLOW / IBM PLEX MONOAa
0123456789 → 17:42 GST
IDENTITY & COMPONENTS

Built to be read at a glance.

Distinctive typography, custom icons, and a restrained signal-orange accent.

04 / RIDER EXPERIENCE

Clarity goes with the rider.

A practical mobile companion that keeps stop details and delivery confirmation close at hand.

Darbak rider device campaign photograph
darbakYOUR NEXT STOPAl NahdaDelivery DK-8042
Bur DubaiDeiraAl QusaisAl NahdaAl KhanMuwailehARABIAN GULFSERVICE NETWORK / SCHEMATIC
Arrival window18:00–18:30
Delivery methodRecipient signature
View stop details →
darbak

A clear next step.
At every stop.

Location, receiving instructions, and delivery confirmation travel with the rider.

Review and confirm while safely stopped.
05 / A DAY IN OPERATIONS

Different hours.
The same clear picture.

Select a shift to explore its operational focus.

06 / WORKSPACE & HANDOVER

Ready for the next person on shift.

A familiar entry point, consistent navigation, and a handover that preserves the details the next operator needs.

darbak
DISPATCHER WORKSPACE

Your next shift starts here.

Routes, riders, and every handoff.
Ready when you are.

Designed for the operations team.
SHIFT OPERATIONS / DARBAK
Dusk over an urban distribution district
darbakRoute handover
Overview
Routes & riders
Handover
Reports
EVENING / 20:00 GST

A complete handover.

Delivery recordsReconciled
Open exceptionsReview required
Rider availabilityUpdated
Next shift notesReady
Shift notes stay attached to the route. The next operator picks up with the full context.
07 / THE DARBAK IDENTITY

A route. A direction. A distinct identity.

A custom D-shaped route mark, industrial typography, and warm orange signals connect the brand to its everyday use.

CONTINUOUS ROUTE / FORWARD DIRECTION
darbak

Every delivery.
A clear way forward.

#11140F#FF8A48#ECEDE5#9CA98D
BARLOW / REGULAR + SEMIBOLDKeep moving.

Aa Bb Cc Dd Ee Ff Gg Hh Ii Jj Kk Ll Mm
Nn Oo Pp Qq Rr Ss Tt Uu Vv Ww Xx Yy Zz

IBM PLEX MONO / 0123456789 / 17:42 GST / RT-2148
CUSTOM OPERATIONAL ICONS
routeriderboxpinshieldclockalertchart
DESIGN THAT SUPPORTS THE DECISION

Less searching.
A clearer next action.

01

Visibility

Route progress, available capacity, and failed stops share one operational view.

02

Continuity

Reassignment preserves the reason, rider, stop, and delivery context.

03

Confidence

Clear labels, readable numbers, and consistent controls support the people running the shift.

What should work better
for your business?

Turn the challenge into a project brief. Prepare it here, then copy or download it. Nothing is sent.

Prepare a brief